End User
Scottish and Southern Electricity Networks
Project Title
Protection Task Force – Review of existing 33kV protection settings for the South network
Year
2019
Project Scope
Review of existing 33kV protection settings and grading studies involving SSEN South of England distribution network for Burghfield and Thatcham regions.
Our Scope
- Undertake manual settings calculations in excel spreadsheet for each type of protection i.e. distance protection, over current, earth fault, instantaneous over current
- Check the settings compliance against the latest protection settings standard issued by Operational Technology
- Identify errors by comparing against the live settings data in Maximo
- Prepare and propose new settings in Maximo and issue to field team
- Provide feedback to Operational Technology on settings constraints
- Prepare a summary overview of the settings in SLD
Our Key Attributes
- Produced a set of standard guidelines in single line drawing format to aid the understanding of protection settings calculation and methodology for IDMT relay and Distance protection.