End User
UK Power Networks
Project Title
33kV DNO Substation
Year
2017
Project Scope
Design, supply, installation and commissioning of 33kV UKPN Substation and associated interfacing works to facilitate the connection of 4.0 MW Solar PV generation plant.
Our Scope
Provide a complete turnkey design solution to G81 standards for ICP:
- 33kV GRP Substation civil and electrical design, including earthing
- Protection and control system
- 33kV power cable design
- Multicore cable and interfacing
Our Key Attributes
- Reduced the grid connection cost – the original PoC offer proposed 3 panel board for loop-in-loop-out configuration, UKPE provided technical justifications and convinced the hosting DNO to reconsider the offer for 2 panel board with tee-off configuration.