Client
UK Power Networks
Project Title
Civil, Electrical and Cable design for 132kV schemes (Concept and Detailed Design)
Year
2020 to 2026
Project Scope
A modification is proposed at Hartley 132kV Grid Substation to convert the existing 132kV overhead connection terminal tower PNB1 to the Grid Substation via a Teed-off connection using 132kV Cable Sealing End and cable.
Our Scope
Preparation of concept and develop design:
- Civil foundation and structural design for cable sealing end, fence extension, road
- Electrical primary design covering plant layout, clearances, busbars, conductors, connectors, high frequency earthing
- 132kV cable design including CSE and earth bonding