132/33kV Grid Transformers Replacement
(Project Development, FEED & Detailed Design)

End User

Scottish and Southern Electricity Networks

Project Title

Replacement of 132/33kV Grid Transformers A1MT, A2MTA, A2MTB at 132/33kV Havant Substation

Year

2019/20

Project Scope

Replacement of existing 132/33kV 90MVA and 45MVA transformers in stages. The design scope covers Stage 1 concept design to develop a high-level P&C concept as defined in the Technical Report (TR) and Stage 2 design, creating full detailed designs drawings as agreed in Stage 1 design scope.

Our Scope

Our Key Attributes

Accredited by:
Registered with:

Copyright © UK Power Engineers Ltd 2015 – 2021. All rights reserved. Privacy Policy

Our website uses cookies and thereby collects information about your visit to improve our website (by analyzing), show you Social Media content and relevant advertisements. Please see our privacy policy page for furher details or agree by clicking the 'Accept' button.

Cookie settings

Below you can choose which kind of cookies you allow on this website. Click on the "Save cookie settings" button to apply your choice.

FunctionalOur website uses functional cookies. These cookies are necessary to let our website work.

AnalyticalOur website uses analytical cookies to make it possible to analyze our website and optimize for the purpose of a.o. the usability.

Social mediaOur website places social media cookies to show you 3rd party content like YouTube and FaceBook. These cookies may track your personal data.

OtherOur website places 3rd party cookies from other 3rd party services which aren't Analytical, Social media or Advertising.