projects-02

Civil, Electrical and Cable design for 132kV
(Concept and Detailed Design)

Client

UK Power Networks

Project Title

Civil, Electrical and Cable design for 132kV​ (Concept and Detailed Design)

Year

2020 to 2026

Project Scope

A modification is proposed at Hartley 132kV Grid Substation to convert the existing 132kV overhead connection terminal tower PNB1 to the Grid Substation via a Teed-off connection using 132kV Cable Sealing End and cable.

Our Scope

Preparation of concept and develop design:

Accredited by:
Registered with:

Copyright © UK Power Engineers Ltd 2015 – 2021. All rights reserved. Privacy Policy

Our website uses cookies and thereby collects information about your visit to improve our website (by analyzing), show you Social Media content and relevant advertisements. Please see our privacy policy page for furher details or agree by clicking the 'Accept' button.

Cookie settings

Below you can choose which kind of cookies you allow on this website. Click on the "Save cookie settings" button to apply your choice.

FunctionalOur website uses functional cookies. These cookies are necessary to let our website work.

AnalyticalOur website uses analytical cookies to make it possible to analyze our website and optimize for the purpose of a.o. the usability.

Social mediaOur website places social media cookies to show you 3rd party content like YouTube and FaceBook. These cookies may track your personal data.

OtherOur website places 3rd party cookies from other 3rd party services which aren't Analytical, Social media or Advertising.